Typical Method using Sanwa Auger
- 1For Pre-cast concrete pile or Steel tube pile
- 1-1 Pre-boring and final setting by blowing
- 1-2 Pre-boring with root hardening cement slurry
- 1-3 Pre-boring combined Hammering
- 1-4 Pre-boring and enlarged root with cement slurry
- 1-5 Boring with Pile while blowing
- 1-6 Boring combined Pile with root bulb
- 1-7 Drive by Pile rotating
- 1-8 For Steel Pipe Screw Pile
- 2For P.I.P method (Cast in place pile)
- 3For M.I.P method (Mixed in place pile)
- 4By using Sanwa Doughnut Auger
- 5For Sand or Gravel Drain
- 6For Quick Lime Deep Soil Stabilization Method