After carrying out the pre- boring of the soil layers by Earth auger,bearing capacity is made to ensure by the hammering.
It uses in many cases in order to reduce vibration and noise, the case where there are hard sub layers and a piling cannot penetrate.
For application pile diameter, about 300-800mm and the maximum pile length are about 110 times of pile diameter.